File:Low Water Marina Canal Halfway Up Bulkhead.jpeg

From mywiki
Jump to navigation Jump to search

Original file(2,592 × 1,936 pixels, file size: 1.64 MB, MIME type: image/jpeg)

Canal at low water on April 17th 2016.

It has gotten worse since then and while the middle maintains the depth at connective level the sides have filled in even more getting shallower and shallower to where boats at high side winds can no longer get in and out of marina at normal water level.

Need to excavate whole width of the canal to connective depth to maintain navigation purpose of the bulkhead built in 2007 on permit 46484A.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current12:12, 11 June 2020Thumbnail for version as of 12:12, 11 June 20202,592 × 1,936 (1.64 MB)Johnny (talk | contribs)Canal at low water on April 17th 2016. It has gotten worse since then and while the middle maintains the depth at connective level the sides have filled in even more getting shallower and shallower to where boats at high side winds can no longer get...

The following page uses this file:

Metadata