Bridge Replacement Close Corey's Ditch
EditDate | 2024-11-05 |
---|
Related Threads:
On December 9th there will be a public meeting to discuss the bridge replacement on the Causeway and the the Wildlife Preserve's desire to close Corey's Ditch.
[[Analysis::I'm collecting information here in preparation for the meeting.
I heard back from NCDOT. Mr. Gallegher directed me to Mr. Abel who said
- The December 9th meeting is to solicit information in preparation to make a decision on how to replace the bridge.
- The work is planned to be done in 2026
- The Water Elevation Model studying the potential for flooding if Coprey's Ditch was closed indicated The majority of the modeling shows minimal impacts with the closure of the canal except for the area along the causeway. In this area, the elevations range from 0.10’ to 0.74’ with mean of .35’ depending on the storm event. The area adjacent to Knotts Island where the residents live, the modeling shows that with the canal closed the elevations range from -0.48’ to 0.38’ with a mean of 0.05’. There are instances where the closure will actually improve potential flooding issues within the community of Knotts Island but overall there is potential for slight increases in water surface elvations.
The NCDOT also provided me a copy of
NC-615 KNOTTS ISLAND CAUSEWAY BRIDGE REPLACEMENT KNOTTS ISLAND, NORTH CAROLINA HYDRODYNAMIC MODELING UPDATE 09/28/2023
which is linked in NCDOT section.
Log
Question I want to be sure is asked tonight:
Thanks again for the model. In looking at it one scenario I was hoping to run as it was the worst flooding I've seen on the Causeway was the last weekend in July of 2018 (28th 29th). The Sheriff's Department posted a video of fish swimming on the Causeway that made local news Wavy 10 (I know you can't open links for good reason but here it is https://www.facebook.com/watch/?v=10155624680632036 . You can also find it by search "fish swimming on Causeway Knotts Island" You do need Facebook to see the video I think). When I looked at the years of the Storms covered in the model 2018 does not show. Am I missing it? If not why was it not included as it definitely seems pertinent? —Johnny (talk) 21:42, 9 December 2024 (UTC)]]Web References https://johnnywunder.info/mywiki/index.php/Bridge Replacement Close Corey%27s Ditch
Federal Information
NC Program Projects FY23-26 The Programming Decisions Committee (PDC) responsible for the North Carolina Federal Lands Access Program (FLAP) has selected its multiyear Program of Projects. The projects identified for programming for the North Carolina FLAP are listed below in order by Application No. and include
Our Line Item
Roadway Stablization | US Fish and Wildlife Service - Mackay Island National Wildlife Refuge | NCDOT Currituck | 2025 |
NCDOT Information
Background
NCDOT STIP we're on page 5 of NCDOT current STIP slated for 2025 as part of a federal program.
Pertinent Information from plan
CURRITUCK | NC 615 (MARSH CAUSEWAY) | NCDOT | HQ/ VC ENTRACE ROAD TO WEST OF KNOTTS ISLAND ROAD. IMPROVE CORRIDOR AT VARIOUS LOCATIONS. | 3.89 | Highway | Federal Lands Access Program | 1 | Albemarle RPO | HF-0008 | Exempt | FLAP | 2025 | $650,000 | 2023 | $50,000 | $700,000 | FLAP PROJECT NC 71. AWARDED $700K. |
Screenshot our item. Pretty Small :(
Local Copy STIP
2018 Bridge Report where our bridge (26007) was evaluated. See map on page 15.
Our Causeway Bridge as desinated in NC DOT spreadsheet [1]
Currituck 260007 260007 NC615 MARSH CSWY. CREEK OFF BACK BAY BRIDGE 2007 N 99 99 79 A
Last Years Causeway Work
Site is flaky and won't let you look at it unless you sign up so I copied the page here.
Key Takeaways
Keywords from NCDOT information from award Bridge #7 on NC 615.
Old repairs
NCDOT Award $1,125,274.00 NCDOT WBS Element: 15801.1027014 Web Site
CutnPaste Text
Description
Site work and paving for a bridge / tunnel in Knotts Island, North Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The North Carolina Department of Transportation is requesting bids for the following project in Division One Scour repair of Bridge #7 on NC 615 over Corey's Ditch in Currituck County WBS Element: : 15801.1027014 Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime Contractor prior to submitting a bid. Information regarding prequalification can be found. If you are unsure as to whether your firm is currently prequalified by the Department by the Contractual Services Unit, a search of the Directory of Transportation Firms can be performed If you are unable to attend the Bid Opening Conference Call, bid results will also be posted on the Division One Webpage following the 2:00 pm Bid Opening. Feel free to contact me if you have any questions or need any additional information. If you have any questions or concerns, please contact Chris Slachta at (252) 482-1872 (Office) or (252) 209-6721 (Cell). If you have any questions or need additional information concerning this project, please contact Chris Slachta at (252) 482-1872. NCDOT - Scour Repair of Bridge 7 on NC 615 Over Coreys Ditch