Bridge Replacement Close Corey's Ditch

From mywiki
Revision as of 14:25, 8 November 2024 by Johnny (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


EditDate 2024-11-05

Related Threads:

On December 9th there will be a public meeting to discuss the bridge replacement on the Causeway and the the Wildlife Preserve's desire to close Corey's Ditch.

I'm collecting information here in preparation for the meeting.

I heard back from NCDOT. Mr. Gallegher directed me to Mr. Abel who said

  1. The December 9th meeting is to solicit information in preparation to make a decision on how to replace the bridge.
  2. The work is planned to be done in 2026
  3. The Water Elevation Model studying the potential for flooding if Coprey's Ditch was closed indicated The majority of the modeling shows minimal impacts with the closure of the canal except for the area along the causeway. In this area, the elevations range from 0.10’ to 0.74’ with mean of .35’ depending on the storm event. The area adjacent to Knotts Island where the residents live, the modeling shows that with the canal closed the elevations range from -0.48’ to 0.38’ with a mean of 0.05’. There are instances where the closure will actually improve potential flooding issues within the community of Knotts Island but overall there is potential for slight increases in water surface elvations.

The NCDOT also provided me a copy of

NC-615 KNOTTS ISLAND CAUSEWAY
BRIDGE REPLACEMENT
KNOTTS ISLAND, NORTH CAROLINA
HYDRODYNAMIC MODELING UPDATE
09/28/2023

which is linked in NCDOT section.Web References https://johnnywunder.info/mywiki/index.php/Bridge Replacement Close Corey%27s Ditch

Fish Swim on Causeway

Federal Information

NC Program Projects FY23-26 The Programming Decisions Committee (PDC) responsible for the North Carolina Federal Lands Access Program (FLAP) has selected its multiyear Program of Projects. The projects identified for programming for the North Carolina FLAP are listed below in order by Application No. and include

Our Line Item

NC 71 NC 615 Stabiliztion
Roadway Stablization US Fish and Wildlife Service - Mackay Island National Wildlife Refuge NCDOT Currituck 2025

NCDOT Information

Background

NCDOT STIP we're on page 5 of NCDOT current STIP slated for 2025 as part of a federal program.

Pertinent Information from plan
Pertinent Information Readable for these Old Eyes
CURRITUCK NC 615 (MARSH CAUSEWAY) NCDOT HQ/ VC ENTRACE ROAD TO WEST OF KNOTTS ISLAND ROAD. IMPROVE CORRIDOR AT VARIOUS LOCATIONS. 3.89 Highway Federal Lands Access Program 1 Albemarle RPO HF-0008 Exempt FLAP 2025 $650,000 2023 $50,000 $700,000 FLAP PROJECT NC 71. AWARDED $700K.

Screenshot our item. Pretty Small :(

Local Copy STIP


2018 Bridge Report where our bridge (26007) was evaluated. See map on page 15.

Our Causeway Bridge as desinated in NC DOT spreadsheet [1]

Currituck 260007 260007 NC615 MARSH CSWY. CREEK OFF BACK BAY BRIDGE 2007 N 99 99 79 A

Last Years Causeway Work

Site is flaky and won't let you look at it unless you sign up so I copied the page here.

Key Takeaways

Keywords from NCDOT information from award Bridge #7 on NC 615.

Old repairs

NCDOT Award
$1,125,274.00
NCDOT WBS Element: 15801.1027014
Web Site

CutnPaste Text

Description

Site work and paving for a bridge / tunnel in Knotts Island, North Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The North Carolina Department of Transportation is requesting bids for the following project in Division One Scour repair of Bridge #7 on NC 615 over Corey's Ditch in Currituck County WBS Element: : 15801.1027014 Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime Contractor prior to submitting a bid. Information regarding prequalification can be found. If you are unsure as to whether your firm is currently prequalified by the Department by the Contractual Services Unit, a search of the Directory of Transportation Firms can be performed If you are unable to attend the Bid Opening Conference Call, bid results will also be posted on the Division One Webpage following the 2:00 pm Bid Opening. Feel free to contact me if you have any questions or need any additional information. If you have any questions or concerns, please contact Chris Slachta at (252) 482-1872 (Office) or (252) 209-6721 (Cell). If you have any questions or need additional information concerning this project, please contact Chris Slachta at (252) 482-1872. NCDOT - Scour Repair of Bridge 7 on NC 615 Over Coreys Ditch