File:Water Elevation Model.pdf: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

6 November 2024

  • curprev 19:2719:27, 6 November 2024Johnny talk contribs 219 bytes +219 This is the Water Elevation Model prepared to determine the impact of the work at Corey's Ditch to replace the NC 615 Bridge on the Knotts Island Causeway. I got it from NCDOT Mr. Abel on November 6, 2024